Detail matters
The specifics of how we do industrial inspection & testing.
Commercial and industrial periodic inspection is where a lot of contractors cut corners. A proper report takes time — full circuit schedules, test results recorded against each circuit, and observations graded to BS 7671 Appendix 6 rather than a home-rolled scoring system. Twenty years of doing this work across Cheshire commercial premises means we know what mainstream insurers, mortgage lenders and Cheshire East enforcement officers expect to see on the front page of the report.
What we actually test
Insulation resistance on every circuit within the agreed extent, earth fault loop impedance at each distribution board and at the furthest point of representative circuits, RCD trip times at 1x, 5x and half rated current, continuity of protective conductors and polarity. Live sampling where full isolation isn't achievable, with the limitations recorded formally on the report.
How observations are coded
C1 — danger present, immediate action required. C2 — potentially dangerous, urgent remedial action required. C3 — improvement recommended. FI — further investigation required. Every code carries a plain-English explanation so you can make an informed decision about scope and priority.
Report limitations, done properly
Any circuit that couldn't be isolated, any equipment that couldn't be accessed, any test that couldn't be completed — all recorded formally in Section D of the report. That's what makes the report defensible if it's ever challenged, not what makes it look bad.
Remedials, quoted at the same time
Where the overall report code is Unsatisfactory, you get a separately-priced, fixed-quote remedial schedule attached to the report. You decide whether we carry out the works. The report is written to the same standard whether we do the remedials or not.