How deep does buried cable need to go?
SWA (steel-wire armoured) cable buried at 450 mm minimum in soil, or 600 mm under a drive or crossable surface, with marker tape 150 mm above the cable. We photograph before backfill for future reference.
Can I have a socket outside without a full new circuit?
Sometimes — a single outdoor spur off a healthy indoor ring is acceptable where the ring isn't already overloaded. Larger installs (multiple outdoor sockets, garden lighting) usually get a dedicated circuit.
Do outdoor lights need special fittings?
Yes — IP65 minimum for most exterior positions, higher for direct exposure. UV-stable materials where sunlight is direct. We specify the correct fitting for each location.
Can you install a hot tub supply?
Yes — regularly. We coordinate with the hot tub supplier to confirm exact load and RCD type, install a dedicated circuit with correctly located isolator, and certify on commissioning.
Do you work with landscapers?
Yes — several Cheshire landscapers refer us for the electrical scope of their projects. We time trenching to fit the wider build so cables go in before turf.
How long does garden lighting take to install?
A modest scheme (six to twelve fittings on a single circuit) is usually one to two days including trenching. Larger schemes quoted with a clear day count.
Are outdoor circuits more expensive?
Slightly — armoured cable, IP-rated accessories and trenching cost more than indoor equivalents. We quote the whole scope in writing so there are no surprises.
Will my garden lights be smart-controllable?
Yes — photocell (dusk-to-dawn), astronomical timer, or full smart hub integration (Hue, Loxone, LightwaveRF). Choice depends on how you want to control them.